Building
the Footings - Part III
As I write this, it's late in the evening at beautiful
Day Creek. I may not have indoor plumbing, but I've got power and a phone
line. The combination of the two gives me access to the outside world
and through the magic of the Internet, I'm able to send to you the latest
and greatest news!
I
arrived here one week ago hoping that I would (1) be able to complete
the footings on time and (2) the weather would hold up for May 22nd, the
date of the concrete pour for the footings and piers. The week was full
of many ups and downs. As I arrived on Sunday, May 16th the rain began
to fall. Not just rain, but torrential rain along with thunderstorms to
boot. These storms persisted on and off (mostly on) until late Monday.
Needless to say, I was unable to get any of the work done that I planned.
Much of my time was spent getting the cabin supplied for my summer stint
and cleaning up the pole barn.
Tuesday morning, I was ready to go, but the clouds and rain stayed around in the morning only giving me half a day to work on the footings. I was able to get most of the insulation done.
Wednesday morning it rained (briefly). By afternoon, the rebar had been laid and shaped leaving just about an hours worth of rebar work left. I was also able to dig 5 of the 8 piers. This was no little feat considering that most of the holes had rocks and a few boulders weighing at least 50 lbs. to be pried and removed.
Thursday it rained for most of the day. It was a good thing that I had covered the center piers the night before. Late Thursday I got about 3 hours in -- just enough time to dig the other 3 piers. I was a bit worried if I would make the Saturday date, but things now were looking good.
Then... yes... it rained overnight and into Friday morning. Now I was getting quite concerned about the giant mud hole that surrounded the building site. I realized there would be no way for the concrete trucks to get up around the building site. So... Friday was spent trying to make our gravel road drivable. After an entire week of rain, things were quite bad. Luckily, my friend Russ who had helped dig the trench for the foundation was able to dump 4 truckloads of gravel. I spent the entire day on Friday, using the Bobcat dumping and spreading gravel to make the road passable. Russ almost got stuck with his dump truck, a delivery truck did get stuck and I managed to get the Bobcat stuck in mud up past the wheels. It took me over an hour to dig the bobcat out by using a hand shovel and the front loader on the Bobcat. What a gigantic mess and a rather costly expense to make a road for the concrete trucks. Jo and her brother (Jon) arrived at 6:30 in the evening and helped put the final pieces of rebar in place for the pour Saturday morning. By 8:30 in the evening we were ready for the pour.
Saturday
morning it did not rain. (Amazing, simply amazing.) But it did start out
on a rather bad note, a friend of mine (Gary) drove up from Illinois overnight
and hit a deer on the way up almost tipping his van over. The van was
still drivable and luckily Gary was O.K. I really felt bad that Gary went
way out of his way to help, and then had this happen to him. He seemed
rather happy about the accident he was looking forward to getting a new
van!
The
trucks promptly arrived at 8 a.m. and the fun began! We ended up having
plenty of helpers: Jo and two of her brothers (Jon and Bill) along with
Bill's wife Terri, Gary and Tim. Tim was recommended to me from Russ.
Tim does concrete work on the side and was a great help along with everyone
else.
By
10:30, we were completely done. After all the worrying and long days this
week, the goal was reached.
It's nice to know that you've got friends and relatives to help out in a pinch. After a few days of pampering the footings, I will start construction of our house. Stay tuned for the latest and greatest from Day Creek.
|
|
||||||||||||||||||||||||||||||||||||||||||||